Renewable Energy Plant Room, North Yorkshire

Client Brief:

To replace an ugly metal container housing the pellet boiler and replace with a plant room and log-store that was aesthetically pleasing, functional and part of the house.
  • Renewable Energy Plant Room, North Yorkshire by Acura Build
  • Renewable Energy Plant Room, North Yorkshire by Acura Build
  • Renewable Energy Plant Room, North Yorkshire by Acura Build

The main problem, apart from the temporary nature of the boiler shed, was condensation along with poorly insulated pipes that had the boiler running almost continuously.

Our groundworks included drainage followed by a concrete base and insulated floor to cope with harsh winter conditions frequently experienced in this high, rural location.

Quality of workmanship was important as the building was essentially an extension of the garage and the slate roof helps it become part of the house.

We also procured and installed the boiler and chimney prior to formal commissioning by a certified engineer.